Automatic Mining Assembly Line Conveyor Belt Roller System 3phase
Basic Properties
Trading Properties
| Belt Speed: | 0-10 M/min | Productname: | Roller Conveyor Line |
|---|---|---|---|
| Surfacefinish: | Powder Coated | Belt Type: | Roller |
| Speed: | 0-20 Meters Per Minute (motorized) | Drivetype: | Gravity Or Motorized |
| Application: | Material Handling And Assembly Lines | Rollerlength: | 1000 Mm |
| Power Supply: | 220V/380V/manual | Conveyorlength: | 10 Meters |
| Operatingtemperaturerange: | -10°C To 50°C | Conveyor Length: | 10 Meters/Customized |
| Loadcapacity: | 150 Kg Per Meter | Installationtype: | Floor Mounted |
| Frametype: | Adjustable Height | ||
| Highlight | automatic assembly line conveyor belt,3phase assembly line conveyor belt,3phase conveyor belt line |
||
Mining Roller Conveyor Line with Diameter Range 89 to 159 Millimeters Engineered for Performance in Material Handling Systems

FEATURES AT A GLANCE
* pipe auto feeding.pipe is auto feed to cutting machine by feeding bed
* pipe auto cutting.pipe is auto cut in cutting machine.
* pipe both ends boring.pipe both ends are auto bored in boring machine.
* auto press bearing housing. bearing hosuing is pressed to pipe after pipe finishing boring.
* pipe both ends auto welding.bearing housing is welded to pipe in welding machine.
* each step is auto transfered to next step
PRODUCT OVERVIEW
Purpose of roller auto manufacturing line
Scope of Application
Applicable workpiece parameters
| finished roller pipe length | 200-2000mm |
| pipe diameter | φ76,φ89, φ108, φ133, φ159, φ194,219mm |
| pipe thickness | 3-8mm |
| original tube length | 6400mm or other length |
| pipe material | Q235A |
| roller shaft length | 300-2100mm |
| the length of the roller shaft exceeds the pipw end | >10mm,≤50mm |
| roller shaft diameter | φ20,φ25,φ30,φ35,φ40,φ45,φ50 |
| roller shaft center hole diameter | φ8mm |
| bearing type | 6204,6205,6305,6306,6307,6308,6309,6310 |
| bearing housing thickness | ≤5mm |
| difference between the through-hole size of the bearing housing and the minimum diameter of the shaft | >5 mm |
| roller max weight | 80kg |
| roller implementation standard | "MT821-2006 Technical Conditions for Idlers of Belt Conveyors Used in Coal Mines" |
Equipment operating environmental conditions
|
site |
indoor |
|
ambient temperature |
-10°C ~55°C |
|
ambient humidity |
20~85RH |
|
compressed air |
pressure0.5~0.7Mpa(dry/clean/no oil) |
|
electricity |
3phase 5wires AC 380V±10% 50Hz |
|
factory&foundation |
foundation shall be fabricated based on the foundation drawings provided by seller; it shall be capable of withstanding the vibration and impact specified in the "General Technical Conditions for Machine Tool Digital Control Systems" (JB/T 8832-2001) |
Machine Characteristics
From raw materials to finished products, the workpieces do not need to be placed on the ground or manually transported. A combination of powered and non-powered methods is employed, with material storage areas set up before and after each workstation. The flow of pipes at each workstation is managed mechanically. After welding the bearing housing, the shafts are manually inserted, and the placement of bearing housing at both ends, sealing components at both ends, and outer covers is done manually.
The fixed-length cutting system for steel pipes on the production line adopts a form where the pipe is fixed and the cutting tool rotates with radial servo feed. Up to four cutting tools can be equipped for simultaneous cutting, ensuring efficient and stable cutting. The storage rack can store 10 pipes with a diameter of φ219 (stackable), which are lifted into place by a crane. The storage rack is inclined at a reasonable angle, allowing the steel pipes to automatically roll down to the automatic feeding position. The automatic feeding flapper is driven by multiple sets of air cylinders, which can sequentially flip the steel pipes on the storage rack one by one into the fixed-length feeding conveyor roller table.
The conveyance of steel pipes from the fixed-length cutting system to the pipe boring machine on the production line adopts the method of transferring with a small carrier vehicle.
The production line adopts the boring hole process for steel pipe end preparation, which involves positioning and clamping the pipe's outer circumference, using a standard carbide tool with a mechanical clamp, rotating, and advancing the tool to complete the inner hole end preparation boring or chamfering. The equipment utilizes hydraulic tool advancement, and the length is adjusted using a positioning screw during model changes, making model changes and adjustments convenient.
The bearing housing, bearing, inner cover, and sealing components are manually loaded and hydraulically pressed into place.
The bearing housing is welded using a dual-gun high-speed automatic welding machine, with the tube rotating while the welding guns remain stationary.
Choosing this production line can not only enhance labor productivity, reduce labor intensity, and improve the working environment for workers, but also improve the stability and reliability of product quality. The entire line equipment can be used for both integrated and individual production, making it an ideal equipment for specialized production.
Factory Show

CE CERTIFICATE/ EU STANDARDS

CUSTOMER VISITING FACTORY & CHECKING QUALITY

GOOD COMMENTS FROM CUSTOMERS

PACKAGE & SHIPPING

SALES & SERVICE NETWORK

FAQ
Q1:How can I know machine is that I need?
A1:Contact our sales, add whatsapp 008618226192162 or email haconveyor@gmail.com for machine detail and your requirement.
Q2 : Can you install machine or test machine in customer site?
A2 : Yes, we can go abroad to customer's site to install and test machine, and train their workers to use machine. or we can guide online.
Q3 : Do you provide spare parts?
A3 : Yes, we provide 2 years spare parts for free.
Q4 : What trade terms do you support?
A4 : We accept FOB China port, CIF, EXW.
Q5 : What payment terms do you accept?
A5 : We accept transfer by T/T, L/C at sight.
Q6 : What about your delivery time?
A6 : single machine is 15-20 nature days, machine line is not more than 60 nature days.
Contact Person: Mr. Jackson Shi
Tel: +86-18095661050