logo

Customized Roller Conveyor Line Equipment Assembly 3 Phase

Basic Properties

Place of Origin:China
Brand Name:HAconveyor
Certification:CE ISO
Model Number:HACP-219

Trading Properties

Minimum Order Quantity:1 set
Price:500000USD/set
Standard Packaging:wooden case
Delivery Time:75 days
Payment Terms:T/T,D/P,D/A,L/C
Supply Ability:1 set/75 days
Specifications
Speed: 0.5 To 2 M/s Frame Width: 500 Mm/Customized
Control System: PLC/Manual Belt Speed: 0-10 M/min
Conveyor Length: 10 Meters/Customized Load Capacity: 200 Kg/Customized
Rollerlength: 1000 Mm Productname: Roller Conveyor Line
Operatingtemperaturerange: -10°C To 50°C Frame Height: 800 Mm/Customized
Conveyorlength: 10 Meters Material: Steel
Roller Diameter: 50 Mm/manual Belt Type: Roller
Rollerdiameter: 50 Mm
Highlight

Roller Conveyor Line Equipment

,

3 phase Roller Conveyor Line

,

3 phase belt assembly line

Product Description

Top Sale HAconveyor Dia 89-159mm Mining Conveyor Roller Auto Making Equipment Line

Customized Roller Conveyor Line Equipment Assembly 3 Phase

FEATURES AT A GLANCE

* pipe auto feeding.pipe is auto feed to cutting machine by feeding bed
* pipe auto cutting.pipe is auto cut in cutting machine.
* pipe both ends boring.pipe both ends are auto bored in boring machine.
* auto press bearing housing. bearing hosuing is pressed to pipe after pipe finishing boring.
* pipe both ends auto welding.bearing housing is welded to pipe in welding machine.
* each step is auto transfered to next step

 



 

PRODUCT OVERVIEW

Purpose of roller auto manufacturing line

 

This automated production line is purpose-built for conveyor idler fabrication, covering a full sequence of steel pipe processing operations. It carries out automatic pipe loading, precision length cutting for steel tubes with outer diameters of φ89, φ108, φ133, φ159, φ194 and φ219 mm. It also performs inner chamfering and boring on the pipe ends, followed by press assembly of bearing models 204, 205, 305, 306, 307, 308, 309 and 310, alongside their matched bearing housings tailored for each corresponding pipe size. Subsequent processes include double-ended circumferential welding of bearing housings, installation of inner and outer sealing components, and final press-fitting of end caps to finish the idler tube assembly.
 
Separately, the line integrates a dedicated spindle processing station for idler shafts ranging from φ20 to φ50 mm (φ20, 25, 30, 35, 40, 45, 50 mm). It automates the whole shaft machining workflow: automatic shaft feeding, end-face milling, center hole drilling on shaft ends, transverse hole drilling, edge boring, and circlip groove turning. All these shaft operations run in sequence with minimal manual handling to guarantee consistent machining quality.
 
We supply matched full sets of tooling and clamping fixtures for every workstation on the line, compatible with all standard specifications of belt conveyor idlers. This comprehensive tooling package supports flexible batch production and rapid switching between different idler models. Our fixtures are engineered with high positioning accuracy, stable clamping performance and long service life. Careful structural optimization prevents workpiece distortion under clamping force, and the surface treatment of contact parts effectively eliminates scratches and surface damage on steel pipes and shafts during continuous mass production.

 

Scope of Application

Applicable workpiece parameters

finished roller pipe length 200-2000mm
pipe diameter φ76,φ89, φ108, φ133, φ159, φ194,219mm
pipe thickness 3-8mm
original tube length 6400mm or other length
pipe material Q235A
roller shaft length 300-2100mm
the length of the roller shaft exceeds the pipw end  >10mm,≤50mm
roller shaft diameter φ20,φ25,φ30,φ35,φ40,φ45,φ50
roller shaft center hole diameter φ8mm
bearing type 6204,6205,6305,6306,6307,6308,6309,6310
bearing housing thickness ≤5mm
difference between the through-hole size of the bearing housing and the minimum diameter of the shaft >5 mm
roller max weight 80kg
roller implementation standard "MT821-2006 Technical Conditions for Idlers of Belt Conveyors Used in Coal Mines"

 

 

Equipment operating environmental conditions

site

indoor

ambient temperature

-10°C ~55°C

ambient humidity

20~85RH

compressed air

pressure0.5~0.7Mpa(dry/clean/no oil)

electricity

3phase 5wires   AC 380V±10%    50Hz

factory&foundation

foundation shall be fabricated based on the foundation drawings provided by seller; it shall be capable of withstanding the vibration and impact specified in the "General Technical Conditions for Machine Tool Digital Control Systems" (JB/T 8832-2001)

 

Machine Characteristics

From raw materials to finished products, the workpieces do not need to be placed on the ground or manually transported. A combination of powered and non-powered methods is employed, with material storage areas set up before and after each workstation. The flow of pipes at each workstation is managed mechanically. After welding the bearing housing, the shafts are manually inserted, and the placement of bearing housing at both ends, sealing components at both ends, and outer covers is done manually.

 

The fixed-length cutting system for steel pipes on the production line adopts a form where the pipe is fixed and the cutting tool rotates with radial servo feed. Up to four cutting tools can be equipped for simultaneous cutting, ensuring efficient and stable cutting. The storage rack can store 10 pipes with a diameter of φ219 (stackable), which are lifted into place by a crane. The storage rack is inclined at a reasonable angle, allowing the steel pipes to automatically roll down to the automatic feeding position. The automatic feeding flapper is driven by multiple sets of air cylinders, which can sequentially flip the steel pipes on the storage rack one by one into the fixed-length feeding conveyor roller table.

 

The conveyance of steel pipes from the fixed-length cutting system to the pipe boring machine on the production line adopts the method of transferring with a small carrier vehicle.

 

The production line adopts the boring hole process for steel pipe end preparation, which involves positioning and clamping the pipe's outer circumference, using a standard carbide tool with a mechanical clamp, rotating, and advancing the tool to complete the inner hole end preparation boring or chamfering. The equipment utilizes hydraulic tool advancement, and the length is adjusted using a positioning screw during model changes, making model changes and adjustments convenient.

 

The bearing housing, bearing, inner cover, and sealing components are manually loaded and hydraulically pressed into place.

 

The bearing housing is welded using a dual-gun high-speed automatic welding machine, with the tube rotating while the welding guns remain stationary.

 

Choosing this production line can not only enhance labor productivity, reduce labor intensity, and improve the working environment for workers, but also improve the stability and reliability of product quality. The entire line equipment can be used for both integrated and individual production, making it an ideal equipment for specialized production.

 

Factory Show

Customized Roller Conveyor Line Equipment Assembly 3 Phase

CE CERTIFICATE/ EU STANDARDS

Customized Roller Conveyor Line Equipment Assembly 3 Phase

CUSTOMER VISITING FACTORY & CHECKING QUALITY

Customized Roller Conveyor Line Equipment Assembly 3 Phase

GOOD COMMENTS FROM CUSTOMERS

Customized Roller Conveyor Line Equipment Assembly 3 Phase

 

 

PACKAGE & SHIPPING

Customized Roller Conveyor Line Equipment Assembly 3 Phase

SALES & SERVICE NETWORK

Customized Roller Conveyor Line Equipment Assembly 3 Phase

 

FAQ

Q1:How can I know machine is that I need?
A1:Contact our sales, add whatsapp 008618226192162 or email haconveyor@gmail.com for machine detail and your requirement.

Q2 : Can you install machine or test machine in customer site?
A2 : Yes, we can go abroad to customer's site to install and test machine, and train their workers to use machine. or we can guide online.

Q3 : Do you provide spare parts?
A3 : Yes, we provide 2 years spare parts for free.

Q4 : What trade terms do you support?
A4 : We accept FOB China port, CIF, EXW.

Q5 : What payment terms do you accept?
A5 : We accept transfer by T/T, L/C at sight.

Q6 : What about your delivery time?
A6 : single machine is 15-20 nature days, machine line is not more than 60 nature days.

Contact Details
Hefei Hengan Conveyor Machinery Co., Ltd,

Contact Person: Mr. Jackson Shi

Tel: +86-18095661050

Send your inquiry directly to us
(0/3000)