80kg Assembly Line Conveyor System For 76-219mm Roller Manufacturing
Basic Properties
Trading Properties
| Pipe Diameter: | φ76, φ89, φ108, φ133, φ159, φ194, 219mm | Pipe Thickness: | 3-8mm |
|---|---|---|---|
| Roller Length: | 200-2000mm | Shaft Diameter: | φ20, φ25, φ30, φ35, φ40, φ45, φ50mm |
| Bearing Type: | 6204, 6205, 6305, 6306, 6307, 6308, 6309, 6310 | Max Roller Weight: | 80kg |
| Highlight | 80kg assembly line conveyor system,219mm Roller assembly line conveyor system,219mm Roller assembly conveyor systems |
||
HAconveyor Dia 76–219mm Heavy Duty Conveyor Roller Auto Making Machine Line

- Pipe auto feeding — pipes are automatically fed to the cutting machine via the feeding bed.
- Pipe auto cutting — pipes are automatically cut to length in the cutting machine.
- Pipe both-ends boring — both pipe ends are automatically bored in the boring machine.
- Auto press bearing housing — bearing housings are pressed into the pipe after end boring is completed.
- Pipe both-ends auto welding — bearing housings are welded to the pipe in the welding machine.
- Automatic transfer — each step is automatically transferred to the next workstation.
This manufacturing line is used for automatic pipe feeding, length cutting of steel pipes (diameters φ89, 108, 133, 159, 194 and 219mm), internal chamfering and boring of the rollers, and the press fitting of bearings 204, 205, 305, 306, 307, 308, 309 and 310 together with bearing housings that match the above-mentioned roller diameters. It also performs double-head welding of the bearing housings, internal and external sealing, and press fitting of end caps.
The line is also used for automatic shaft feeding (diameters φ20, 25, 30, 35, 40, 45 and 50mm), milling of shaft ends, drilling of end-surface center holes, drilling of holes, boring of edges and circlip grooving.
We provide complete sets of tooling and fixtures for all workstations of the various carrier roller specifications across the entire production line to meet production needs. The tooling and fixtures are designed to be accurate, reliable and durable, avoiding workpiece deformation that may cause scratches during use.
| Finished roller pipe length | 200–2000mm |
|---|---|
| Pipe diameter | φ76, φ89, φ108, φ133, φ159, φ194, φ219mm |
| Pipe thickness | 3–8mm |
| Original tube length | 6400mm or other length |
| Pipe material | Q235A |
| Roller shaft length | 300–2100mm |
| Length of roller shaft exceeding the pipe end | >10mm, ≤50mm |
| Roller shaft diameter | φ20, φ25, φ30, φ35, φ40, φ45, φ50 |
| Roller shaft center hole diameter | φ8mm |
| Bearing type | 6204, 6205, 6305, 6306, 6307, 6308, 6309, 6310 |
| Bearing housing thickness | ≤5mm |
| Difference between the through-hole size of the bearing housing and the minimum shaft diameter | >5mm |
| Roller max weight | 80kg |
| Roller implementation standard | MT821-2006 Technical Conditions for Idlers of Belt Conveyors Used in Coal Mines |
| Site | Indoor |
|---|---|
| Ambient temperature | -10°C ~ 55°C |
| Ambient humidity | 20 ~ 85 RH |
| Compressed air | Pressure 0.5–0.7MPa (dry / clean / oil-free) |
| Electricity | 3-phase, 5-wire, AC 380V ±10%, 50Hz |
| Factory & foundation | Foundation shall be fabricated based on the foundation drawings provided by the seller; it shall be capable of withstanding the vibration and impact specified in General Technical Conditions for Machine Tool Digital Control Systems (JB/T 8832-2001) |
From raw materials to finished products, workpieces do not need to be placed on the ground or manually transported. A combination of powered and non-powered methods is employed, with material storage areas set up before and after each workstation. The flow of pipes at each workstation is managed mechanically. After the bearing housing is welded, the shafts are manually inserted, while the placement of bearing housings at both ends, sealing components at both ends and outer covers is also done manually.
The fixed-length cutting system for steel pipes on the production line uses a configuration in which the pipe is fixed and the cutting tool rotates with radial servo feed. Up to four cutting tools can be equipped for simultaneous cutting, ensuring efficient and stable cutting. The storage rack can hold 10 pipes of φ219 diameter (stackable), which are lifted into place by a crane. The storage rack is inclined at a reasonable angle, allowing the steel pipes to roll down automatically to the automatic feeding position. The automatic feeding flapper is driven by multiple sets of air cylinders, which sequentially flip the steel pipes on the storage rack one by one onto the fixed-length feeding conveyor roller table.
Steel pipes are conveyed from the fixed-length cutting system to the pipe boring machine on the production line by means of a small carrier vehicle.
The production line adopts the boring process for steel pipe end preparation, which involves positioning and clamping the pipe's outer circumference, using a standard carbide tool with a mechanical clamp, rotating, and advancing the tool to complete the inner-hole end preparation, boring or chamfering. The equipment uses hydraulic tool advancement, and the length is adjusted with a positioning screw during model changes, making model changes and adjustments convenient.
The bearing housing, bearing, inner cover and sealing components are manually loaded and hydraulically pressed into place.
The bearing housing is welded using a dual-gun high-speed automatic welding machine, with the tube rotating while the welding guns remain stationary.
Choosing this production line not only enhances labor productivity, reduces labor intensity and improves the working environment for workers, but also improves the stability and reliability of product quality. The entire line can be used for both integrated and individual production, making it ideal equipment for specialized production.






Q1: How can I know which machine is the one I need?
Contact our sales team: add WhatsApp 008618226192162 or email haconveyor@gmail.com for machine details and to discuss your requirements.
Q2: Can you install or test the machine at the customer's site?
Yes. We can travel abroad to the customer's site to install and test the machine and train their workers to use it, or we can provide online guidance.
Q3: Do you provide spare parts?
Yes, we provide 2 years of spare parts free of charge.
Q4: What trade terms do you support?
We accept FOB China port, CIF and EXW.
Q5: What payment terms do you accept?
We accept T/T bank transfer and L/C at sight.
Q6: What is your delivery time?
A single machine takes 15–20 natural days; a complete machine line takes no more than 60 natural days.
Contact Person: Mr. Jackson Shi
Tel: +86-18095661050