Auto Steel Shaft Square Tube Cutting Machine Pneumatic Clamping 4KW
Basic Properties
Trading Properties
| Power: | 4KW | Shaft Diameter: | Φ0-300mm |
|---|---|---|---|
| Shaft Length: | 120-2700mm | Accuracy: | ±0.05mm |
| Cutting Speed: | 5-15s | Machine Weight: | 800kg |
| Highlight | Auto square tube cutting machine,4KW square tube cutting machine,4KW auto pipe cutting machine |
||
Shaft Processing Machine with Clean Flat Cold Cutting and Pneumatic Clamping for Simple One-Button Operation of Steel Shaft Cutting Machine
- 1Delivers clean, flat cold cutting for a wide range of steel profiles and tubes, replacing multiple traditional cutting machines to meet high-precision cutting demands.
- 2Equipped with pneumatic clamping, saw lifting and automatic unloading functions, it supports single or multiple workpiece cutting with simple one-button operation.
- 3The matched sliding roller racks are adjustable in position and height for stable feeding of workpieces of different lengths.
- 4Easy installation, convenient parameter debugging and stable running greatly save labor and improve cutting efficiency.

This high-performance steel shaft cutting machine is a dedicated cutoff machine tailored for precision steel shaft cutting operations, offering a stable, high-efficiency cutting solution for steel processing workshops. It effectively cuts labor costs and shortens single-piece processing cycles, while producing neat, flat, burr-minimized cutting end faces.
It supports diverse cutting workpieces, covering rebar, solid round bars, square steel, channel steel, round steel tubes and square hollow sections. The cutting accuracy satisfies strict tolerance requirements for modern steel fabrication. Numerous manufacturers select this machine to renovate or replace outdated cutting equipment, including conventional bar cutters, toothless saws, cold saws, circular saws and other traditional metal cutting machinery.
- 1Lay the main unit on a horizontal foundation. Fine-tune the equipment level via the adjustment bolts fitted at the four corners of the machine frame.
- 2Mount the material support frames. Align the angle-adjustable rollers on the support frames with the rollers of the main machine. Reserve a 1-meter initial spacing between the support frame and the main body. Connect separate support frames with linking tubes. Adjust the layout spacing according to the raw material length, arrange the supports evenly and fasten all components securely.
- 3Connect all segments of the discharge rack to the main machine. Each support leg of the discharge rack comes with height adjustment. Ensure the rollers on the discharge rack stay on the same horizontal plane as the rollers on the main cutting unit.
- 4Secure the discharge air cylinder at the designated mounting spot, and install the fixed-length baffle plate according to the target cutting dimension.
- APower on the machine. Manually trigger the AC contactor to verify whether the saw blade rotates in the correct direction.
- BHook up the air pipeline, activate the manual power switch, and test the functional actions including lifting, lowering, releasing and clamping. Keep the working air pressure stable at 6 MPa. Important reminder: the clamping cylinder must remain in the clamped state during the lowering action.
- CRun a trial cut with your target workpiece and batch size to verify synchronization of vertical movement and left-right clamping. Workpieces must be placed flat during clamping without extrusion or stacking. Tune the valve of the left-right clamping cylinder to balance clamping speed and realize synchronous action. When static, the vertical gap between the saw blade and the workpiece should be approximately 1 cm. Adjust this gap through positioning bolts and the upper-limit infrared sensor of the cylinder. Clear all obstacles underneath the saw blade during adjustment to prevent blade breakage or equipment damage. The speed regulating valves for lifting and lowering cylinders can modify the descending and ascending speed on demand; basic parameter calibration has already been finished before delivery from the factory.
- DConnect the air pipes for the discharge cylinder. Raise the lifting cylinder back to its home position and check the signal light of the upper-limit infrared sensor. Adjust the sensor position manually until the indicator lights up if no signal is detected. Next, confirm the sensor signal when the clamping cylinder releases. Repeat the positioning adjustment until the sensor triggers normally.
- ESwitch the control mode from manual to automatic. After all inspections are completed, press the start button and run 1 to 2 test cycles. If the machine operates smoothly without abnormal actions, it is ready for formal production.
| No. | Item | Specification |
|---|---|---|
| 1 | Type | HAJ-70 |
| 2 | Power | 4 KW |
| 3 | Shaft Diameter | Φ0–300 mm |
| 4 | Shaft Length | 120–2700 mm |
| 5 | Accuracy | ±0.05 mm |
| 6 | Cutting Speed | 5–15 s |
| 7 | Machine Size | 840 × 740 × 1480 mm (structure 4000 × 800 mm & 3000 × 800 mm) |
| 8 | Machine Weight | 800 kg |







Q1: How can I know if this is the machine I need?
A1: Contact our sales team, add WhatsApp 008618226192162 or email haconveyor@gmail.com for machine details and to discuss your requirements.
Q2: Can you install or test the machine at the customer site?
A2: Yes. We can travel abroad to the customer's site to install and test the machine and train their workers to use it, or we can guide you online.
Q3: Do you provide spare parts?
A3: Yes, we provide 2 years of spare parts for free.
Q4: What trade terms do you support?
A4: We accept FOB China port, CIF and EXW.
Q5: What payment terms do you accept?
A5: We accept transfer by T/T and L/C at sight.
Q6: What about your delivery time?
A6: A single machine takes 15–20 natural days; a machine line takes no more than 60 natural days.
Contact Person: Mr. Jackson Shi
Tel: +86-18095661050